Fabricante de joyería en moissanita y plata S925 — OEM/ODM, venta al por mayor y marca propia.

Guías de Sourcing y OEM

Selección de proveedores, cantidad mínima de pedido (MOQ), muestreo y procesos de OEM/ODM para compradores de joyería de plata S925.

26articles In this category
65total del pedido Published guides
Nov 2026 Latest update
16yrs Manufacturer since 2010

All articles

26 posts
Guías de Sourcing y OEM

Repedir 300 piezas S925 a la mitad de temporada: retención de moldes, lotes de fundición y si el precio antiguo sigue aplicando

Short answer: a 300-piece mid-season reorder is usually a repeat order, not a new minimum-order run, provided the style is unchanged and the original mold or master pattern is still usable. In silver jewelry, the batch units that decide this are not fabric rolls, cutting tables, or dye lots. They are the mold cavity, the ... <a title="Reordering 300 S925 Pieces Mid-Season: Mold Retention, Casting Lots, and Whether the Old Price Still Applies" class="read-more" href="https://amarajeweiry.com/es/s925-300-piece-mid-season-reorder/" aria-label="Leer más sobre Reordering 300 S925 Pieces Mid-Season: Mold Retention, Casting Lots, and Whether the Old Price Still Applies">Leer más</a>

Guías de Sourcing y OEM

Un reparto 60/40 de stock mayorista y marca propia: así se programa de verdad la producción S925

A 60/40 split is normal in S925 jewelry, but it is not one production schedule. It is two lots that may share a design file and a mold. The 60% wholesale side can run on the stock or stock-mold path; the 40% private-label side runs on the OEM path, with its own sample approval, marking, ... <a title="A 60/40 Split of Wholesale Stock and Private Label: How S925 Production Is Actually Scheduled" class="read-more" href="https://amarajeweiry.com/es/split-order-s925-production-schedule/" aria-label="Leer más sobre A 60/40 Split of Wholesale Stock and Private Label: How S925 Production Is Actually Scheduled">Leer más</a>

Guías de Sourcing y OEM

Cuarto de muestras vs producción en serie: qué debe probar una muestra de preproducción en plata antes de aprobarla

Approve a pre-production sample only if it was produced under the same conditions as your bulk order: the same wax tree or steel mold cavity, the same alloy and casting lot, the same plating bath, the same moissanite parcel, the same soldering, filing and polishing sequence, and the same clasp and chain components. A sample-room ... <a title="Sample Room vs Production Run: What a Silver Pre-Production Sample Must Prove Before You Approve It" class="read-more" href="https://amarajeweiry.com/es/pre-production-sample-vs-production-run/" aria-label="Leer más sobre Sample Room vs Production Run: What a Silver Pre-Production Sample Must Prove Before You Approve It">Leer más</a>

Guías de Sourcing y OEM

Facturación de joyería de plata de marca propia: qué es justo en setup, moldes y repedidos — y qué poner en el contrato

A private-label jewelry program is normally billed as a mix of three lines: a one-time, per-style setup fee covering CAD work, mold cutting, and the first sample; a per-unit price for every piece produced; and occasional pass-through charges per shipment, such as freight, testing, or re-issued certificates. The setup line is where disputes begin. The ... <a title="Private-Label Silver Jewelry Billing: What’s Fair for Setup, Molds, and Reorders — and What to Put in the Contract" class="read-more" href="https://amarajeweiry.com/es/private-label-setup-fees-reorder-policy/" aria-label="Leer más sobre Private-Label Silver Jewelry Billing: What’s Fair for Setup, Molds, and Reorders — and What to Put in the Contract">Leer más</a>

Guías de Sourcing y OEM

Pedidos Mixtos de Plata S925: Qué Impulsa Realmente el MOQ en 10 Estilos de 20 Piezas

The direct answer: For a mixed S925 silver order, 10 styles at 20 pieces each is realistic in exactly one case — when all ten styles are public-mould, ready-to-ship designs, so the 200-piece total clears the 30-piece order minimum and no new tooling has to be cut. It becomes fantasy the moment a style needs ... <a title="Mixed S925 Silver Wholesale Orders: What Actually Drives the MOQ on 10 Styles at 20 Pieces Each" class="read-more" href="https://amarajeweiry.com/es/pedido-mayorista-mixto-moq-herramienta/" aria-label="Leer más sobre Mixed S925 Silver Wholesale Orders: What Actually Drives the MOQ on 10 Styles at 20 Pieces Each">Leer más</a>

Guías de Sourcing y OEM

Fijar el precio de la plata en un pedido de 500 piezas de moissanita: la lista de verificación del OC detrás de un presupuesto firme

Short answer: You lock the silver price on a 500-piece moissanite order with clauses written into the purchase order, not with a futures position. Five items do the work: the billable gram weight per SKU, the wastage percentage and the basis it is charged on, a silver adjustment line with both a deadband and a ... <a title="Locking the Silver Price on a 500-Piece Moissanite Order: The PO Checklist Behind a Firm Quote" class="read-more" href="https://amarajeweiry.com/es/fijacion-precio-plata-pedido-500-piezas/" aria-label="Leer más sobre Locking the Silver Price on a 500-Piece Moissanite Order: The PO Checklist Behind a Firm Quote">Leer más</a>

Volver arriba
¿Necesita cotización rápida? Hable con nuestro equipo de exportación por WhatsApp.